Back to home & garden
3
and Garth also patched a big hole (before left; after, on the right).
When things dried, we scraped the loose paint, then primed it--scraping makes things look a lot worse than they were, as here, just below.
The risers painted Saturday
On Sunday the treads were painted, with tape protecting the risers
And finally some touch-up, and the rainings.
Finished!
Sept. 12-23, 2020